AGM - Electrical
Larsen & Toubro
Perspective
Key Responsibilities
Financial
- Ensure availability of all critical spares and reduce down time to increase availability of plant.
- Development of superior substitutes for OEM spares to reduce the cost of spares & maintenance.
- Ensure compliance of permit-to-work (PTW) system/ LOTO system
- 100% compliance of safety observations & training to ensure zero accident.
- Preparation and review of Standard Maintenance Procedures (SMPs) in line with maintenance and spare policies.
- Ensure minimization of costs through continuous improvements and introduction of efficient electrical equipment.
- Ensure documentation is being maintained as per IMS policy
- Preparation of budget and adherence to approved budget.
- Planning and execution of annual overhauling of electrical system within stipulated cost and time.
- Ensure NIL Tripping of unit due to electrical faults.
- Ensure 100% availability of electrical system (AHP, ESP & BOP)
- Planning for Preventive Maintenance and Condition Monitoring of Equipment.
- Attend all service request within the SLAs.
- To carry out breakdown maintenance as per Maintenance Instruction of OEM and restore the equipment/system in the minimum possible time.
- Maintain minimum lux level of illumination system.
- Motivate team members for energy conservation, good maintenance practices and safety practices etc.
- Prepare Trip report & Root cause Analysis of failure of equipment/tripping. Why-why analysis to be done for the repetitive breakdowns
- Learning & Growth
- Knowledge sharing (Training program) to develop team members.
- Provide technical/non-technical external training to employee for development skill.